How do you specify MS973 on an air-conditioning joint?
This case is the use the MS973 sheet already names: sealing of air-conditioning systems. It is that joint. It does not give a pressure rating, and it does not name a customer or a measured saving.
What the sheet fixes
| Item | On the MS973 sheet |
|---|---|
| Named use | Sealing of air-conditioning systems. |
| How to fill | Fill the joint in one pass and tool the surface at once. |
| Wet conditions | The feature list says the grade forms no bubbles in wet or humid conditions. That sentence is not a permission to fill a closed void. |
| Where it stays out | A totally confined space. Curing needs moisture in the air. |
| Tack-free | 10–20 minutes at 23°C and 50% relative humidity. |
| Application temperature | +5°C to +35°C. Below +5°C, wait. Above +5°C in winter, curing is slower. |
Glass, aluminium and stainless steel are degreased with alcohol or MEK. Other metals are lightly abraded, then degreased. If the substrate is not confirmed, run a compatibility test first.
What to send
Send the quantity, the country where the goods will be sold, the pack, and whether the label is your brand or neutral. A 600 ml sausage of standard goods is 10–14 days. Minimum order is 1 tonne, except the 200 kg drum. The price is on the proforma. Ask for the current data sheet and the current safety data sheet. This page does not print a certificate number.
中文
这个案例是数据表写明的空调系统密封。它是这条缝,不写耐压等级,不点名客户,不写省下多少。
- 一次打满,马上收光。
- 特性表写潮湿条件不起泡。这句话不是封闭空腔可以使用的许可。完全密闭、没有空气水分的地方不能用。
- 23°C、50% 相对湿度下表干 10–20 分钟。施工温度 +5°C 到 +35°C。低于 +5°C 先等。
- 玻璃、铝和不锈钢用酒精或丁酮除油。其他金属先轻磨再除油。基材未确认时先做相容性测试。
- 600 ml 标准交期 10–14 天。1 吨起订。价格在形式发票上。