How do you specify MS973 on a warehouse floor joint?
This case is the floor joint and the low-movement wall joint named on the MS973 sheet. A warehouse uses those joints. This page is not a roof coating, and it is not a membrane over the slab. It does not name a customer or a measured saving.
What the sheet gives this joint
| Item | On the MS973 sheet |
|---|---|
| Named use | Floor joints and low-movement wall joints. |
| Joint shape | Width-to-depth ratio 2:1. Fill in one pass and tool at once. |
| Concrete | Brush laitance off. If the substrate is not confirmed, run a compatibility test first. |
| Movement figures | Elongation at break at least 200%. Shore A 40–50. Tensile strength at least 1.8 MPa. These figures are MS973 only. |
| Weather note | The feature list includes UV resistance. The printed range −50°C to +120°C sits under the heading “Construction work time”, so this page does not call it a service temperature. |
| Application temperature | +5°C to +35°C. Below +5°C, wait. |
One 600 ml pack covers about 12 metres of a 10×5 mm joint, about 5 metres of a 15×8 mm joint, about 3 metres of a 20×10 mm joint, about 2 metres of a 25×12 mm joint, and about 1.3 metres of a 30×15 mm joint.
A buyer outside the factory’s home market
Ask KASTAR for the current file for the grade and for the country where you will sell, including Australia and New Zealand. This page does not state that the product is already approved in either country. It also does not state a grams-per-litre figure. For an EU project, the file buyers usually ask for is a CE file and a Declaration of Performance. The handbook points construction sealants to EN 15651.
What to send
Quantity, sales country, pack and label come before a price. Standard 600 ml sausages are 10–14 days. Minimum order is 1 tonne, except the 200 kg drum. The price is on the proforma.
中文
这个案例是数据表写明的地坪缝和低位移墙缝。仓储用的是这两种缝。本页不是屋面涂料,也不是整板防水膜。不点名客户,不写省下多少。
- 缝宽和缝深按 2:1,一次打满,马上收光。混凝土刷掉浮浆。基材未确认时先做相容性测试。
- 断裂伸长率不低于 200%,邵氏 A 40–50,拉伸强度不低于 1.8 MPa。这些数字只属于 MS973。
- 特性表写了抗 UV。表上 −50°C 到 120°C 的栏名是 Construction work time,这里不把它写成使用温度。
- 澳洲、新西兰或其他市场,向 KASTAR 要该型号在销售国的现行文件。本页不写已经获批,也不写克/升。
- 600 ml 标准交期 10–14 天。1 吨起订。价格在形式发票上。